Annual Inspections of PRFs in Cherry Creek State Park can be found on the CCBWQA Data Portal on the Annual Reports PRF Activities page. 

Cherry Creek 

Cherry Creek Reach 1

Archived content:

Cherry Creek Outreach Fact Sheet - 2023

Partners Site Visit Handout - Muller - 2023

Cherry Creek Stream and Water Quality Assessment - Muller - 2022

Cherry Creek Baseline Channel Monitoring Report - Muller - 2022

 

Cherry Creek at 12-Mile Park

Archived content:

Cherry Creek Stream Reclamation at 12-Mile Park Phase 3 - Project Summary - R2R - 2023

Construction Drawings CC Stream Reclamatikon at 12-Mile Park Phase 3 - Jacobs - 2021

Cherry Creek Stream Reclamation at 12-Mile Park Phase 2 - 2014

Cherry Creek at 12-Mile Park Stream Reclamation Phase 1 - Annual Report - 2013

Cherry Creek Stream Reclamation at 12-Mile Park Phase 1 - 2013

Cherry Creek at 12-Mile Park Stream Reclamation - Channel Sedimentation - 2013

Cherry Creek at 12-Mile Park – Sediment Transport Analysis after Storm Event - 2012

Construction Drawings CC Stream Reclamation at 12-Mile Park - Phase 2 - CH2MHill - 2012

Cherry Creek at 12-Mile Park Stream Reclamation Plan - 2012

Construction Drawings CC Stream Reclamation at 12-Mile Park - Phase 1 - CH2MHill - 2011

Cherry Creek at 12-Mile Park Stream Reclamation – Water Quality Benefits and Costs - 2011

Cherry Creek at 12-Mile Park DRAFT Alternatives Evaluation Report - 2011

Cherry Creek at 12-Mile Park DRAFT FINAL Site Assessment Report - 2010

Cherry Creek at 12-Mile Park Proposal: Reclaiming the Stream while Enriching the Dog Park Experience - 2010

 

Cherry Creek at Arapahoe Road

Archived content:

Cherry Creek at Arapahoe Road Reach 2 - 2018

Cherry Creek Stream Reclamation at Arapahoe Road - Reach 5 - JRS Engineering -  2016

 

 Cherry Creek at McCabe Meadows

Archived content:

 Cherry Creek at McCabe Meadows - 2022

 

Cherry Creek at Ecolological Park

Archived content:

 Cherry Creek Stream Reclamation at Eco Park - 2013

Cherry Creek Improvements at the Cherry Creek Eco Park - 2010

 

Cherry Creek at Parker Jordan Centennial Open Space

Archived content:

Cherry Creek Stream Reclamation at PJCOS - 2013

Cherry Creek Stream Reclamation at PJCOS – Modified Design - 2010

 

Cherry Creek at Shop Creek Trail

Archived content:

Cherry Creek at Shop Creek Final Stream Reclamation Plan - 2010

 

Cherry Creek at Hess Road

Archived content:

Cherry Creek Stream Stabilization at Hess Road - JRS Engineering - 2016

 

Cherry Creek at Norton Farms Open Space

Archived content:

Cherry Creek Stream Stabilization at Norton Farms Open Space - JRS Engineering - 2016

Shop Creek 

Archived content:

Shop Creek -2013